One of the construction methods of self-adhesive-LVT
The self-adhesive LVT floor, as the name implies, has its own adhesive on the bottom and back of the floor. It only needs to tear off the release paper and does not need additional glue to achieve the effect of sticking to the ground.
The specific steps of self-adhesive are roughly as follows:
★First of all, the paved ground is required to be in a clean and dust-free state. The ground should be cleaned before construction, and the uneven places need to be adjusted to a flat state.
★Then, measure the size of the range that needs to be installed, and make a basic layout. The type of layout is not single, you can use I-shaped layout and stepped layout, etc., and the assembly methods used can also be diversified, such as: I-shaped assembly, 369 assembly and herringbone assembly.
★Next, define the starting installation line and adjust the position according to the reference line.
Finally, tear off the release paper during construction, and let the glue of the self-adhesive LVT floor and the ground absorb each other to install.
★In addition, the LVT floor with self-adhesive installation method usually has a thickness of 2.0/2.5/3.0/4.0/5.0mm. The floor is suitable for self-leveling, ceramic tile and other floors. At the same time, it should be noted that before pasting, make sure that The ground is to achieve a clean and dust-free state, and at the same time, pay attention to the flatness of the ground before construction.
To a certain extent, self-adhesive LVT floor has the advantage of easy cutting and laying, so its application range will be relatively wide, and it can be used for home improvement renovation, old house renovation, bedroom dormitory, office, commercial store, etc. For places with relatively small space, when purchasing self-adhesive LVT floors, it is also necessary to adapt to local conditions, and determine the size of the products to be purchased according to the size of the space and the place of use.